Comparison between Bondada Engineering IPO and Sungarner Energies IPO.
IPO Details
Bondada Engineering IPO is a SME Fixed Price IPO proposed to list at BSE SME while Sungarner Energies IPO is a SME Fixed Price proposed to list at NSE SME.
The total issue size of Bondada Engineering IPO is up to ₹40.56 Cr whereas the issue size of the Sungarner Energies IPO is up to ₹4.83 Cr. The final issue price of Bondada Engineering IPO is ₹75.00 per share and of Sungarner Energies IPO is ₹83.00 per share.
Bondada Engineering IPO opens on Aug 18, 2023, while Sungarner Energies IPO opens on Aug 21, 2023. The closing date of Bondada Engineering IPO and Sungarner Energies IPO is Aug 22, 2023, and Aug 23, 2023, respectively.
In the Bondada Engineering IPO Retail Individual Investors (RII) are offered 27,04,000 shares while in Sungarner Energies IPO retail investors are offered 27,04,000 shares. Qualified Institutional Buyers (QIB) are offered in Bondada Engineering IPO and in Sungarner Energies IPO.