Durgadevi Raiment IPO vs Sattva Engineering Construction IPO
Comparison between Durgadevi Raiment IPO and Sattva Engineering Construction IPO.
IPO Details
Durgadevi Raiment IPO is a SME Bookbuilding IPO proposed to list at BSE SME while Sattva Engineering Construction IPO is a SME Bookbuilding proposed to list at NSE SME.
The total issue size of Durgadevi Raiment IPO is up to ₹11.40 Cr whereas the issue size of the Sattva Engineering Construction IPO is up to ₹33.58 Cr. The final issue price of Durgadevi Raiment IPO is ₹40.00 per share and of Sattva Engineering Construction IPO is ₹75.00 per share.
Durgadevi Raiment IPO opens on , while Sattva Engineering Construction IPO opens on Aug 26, 2025. The closing date of Durgadevi Raiment IPO and Sattva Engineering Construction IPO is , and Aug 29, 2025, respectively.
In the Durgadevi Raiment IPO Retail Individual Investors (RII) are offered 0 shares while in Sattva Engineering Construction IPO retail investors are offered 0 shares. Qualified Institutional Buyers (QIB) are offered 0 shares in Durgadevi Raiment IPO and 8,88,000 shares in Sattva Engineering Construction IPO.